First Niger bridge reopens as Umahi warns against dredging
The Federal Government has reopened the First Niger Bridge to vehicular traffic following rehabilitation works aimed at improving safety and extending the lifespan of the ageing structure.
The Minister of Works, David Umahi, announced the reopening at a ceremony in Asaba, Delta State, describing the intervention as part of President Bola Tinubu’s commitment to preserving critical national infrastructure.
Umahi said the rehabilitation became necessary following concerns over the bridge’s structural condition, including missing bolts, deteriorating road surfaces and inadequate maintenance.
He explained that the repairs included resurfacing, structural reinforcement, installation of solar-powered streetlights, closed-circuit television cameras and additional traffic safety measures.
The minister said median barriers and three designated turnaround points had also been provided to improve traffic management during emergencies and vehicle breakdowns.
Security monitoring centres, he added, were being established at both ends of the bridge to strengthen surveillance and protect the facility.
Umahi warned against sand dredging near federal bridges, stressing that such activities were prohibited within a 10-kilometre radius.
He directed relevant authorities in Delta and Anambra states to enforce the restriction and prevent activities capable of undermining the bridge’s structural integrity.
The minister also ordered a comprehensive redesign of the Benin-Asaba Expressway ahead of reconstruction, citing the deteriorating condition of the road.
He disclosed that the Federal Government had terminated the remedial contract covering the first 11 kilometres of the highway over concerns about the quality of work.
Umahi further announced plans to reconstruct approximately 400 kilometres of the East-West Road and reaffirmed the government’s commitment to completing major road projects across the Niger Delta and South-East.
Delta State Governor Sheriff Oborevwori welcomed the reopening, describing the bridge as a vital economic link between the South-South and South-East.
Represented by the Commissioner for Works, Charles Aniagwu, the governor called for a stronger maintenance culture to prevent the deterioration of public infrastructure.
Similarly, the Asagba of Asaba, Epiphany Azinge, commended the Federal Government for rehabilitating the bridge, saying the intervention would strengthen public confidence and facilitate economic activities.
The bridge was initially scheduled for closure between 7 and 21 September 2026, but persistent rainfall reportedly delayed the completion of repairs.
During the closure, motorists were advised to use the Second Niger Bridge as an alternative route.



